subject
Physics, 16.12.2020 16:20 shay5878

Electric power is to be generated by installing a hydraulic turbine-generator at a site 70 m below the free surface of a large water reservoir that can supply water at a rate of 1500 kg/s steadily. If the mechanical power output of the turbine is 800 kW and the electric power generation is 750 kW, determine the turbine efficiency and the combined turbine–generator efficiency of this plant. Neglect losses in the pipes.

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 03:30
The focal length of a relaxed human eye is approximately 1.7 cm. when we focus our eyes on a close up object, we can change the refractive power of the eye by about 16 diopters. (a) does the refractive power of our eyes increase or decrease by 16 diopters when we focus closely? explain. (b) calculate the focal length of the eye when we focus closely.
Answers: 3
question
Physics, 22.06.2019 09:30
The necleus of an atom is made up of what subatomic particles?
Answers: 1
question
Physics, 22.06.2019 21:00
If the specific heat of a metal is 0.850 j/g °c, what is its atomic weight?
Answers: 2
question
Physics, 22.06.2019 21:30
While carrying a heavy box up the stairs,you set the box on a step and rest. then you pick up the box and carry it to the top of the stairs. describe these actions in terms of balanced and unbalanced forces acting on the box.
Answers: 1
You know the right answer?
Electric power is to be generated by installing a hydraulic turbine-generator at a site 70 m below t...
Questions
question
Mathematics, 29.05.2020 05:57
question
Mathematics, 29.05.2020 05:57
question
Mathematics, 29.05.2020 05:57
question
Mathematics, 29.05.2020 05:57
Questions on the website: 13722361