subject
Physics, 17.12.2020 21:30 hncriciacheichi

Leslie carries a 2.00-N pebble through the path shown in the figure, starting at point A and ending at point B. The total time from A to B is 6.75 min. How much work did
gravity do on the rock between A and B?

ansver
Answers: 3

Another question on Physics

question
Physics, 22.06.2019 04:10
Calculate the work done by an external agent during an isothermal compression of 1.00 mol of oxygen from a volume of 22.4 l at 10∘c and 1.0 atm pressure to 16.8l
Answers: 2
question
Physics, 22.06.2019 09:30
Asap i'm in class rn a 1,000-kg car is traveling 20 m/s on a flat stretch of road. it gets to a hill and coasts uphill until it stops. how high up the hill does the car travel? givens: equation: 1/2mv2initial=mghfinal solve for h. plug & chug, label.
Answers: 2
question
Physics, 22.06.2019 09:30
For this car, predict the shape of a graph that shows distance (x) versus time (t). note that time is the independent variable and will be on the bottom axis. need asap
Answers: 1
question
Physics, 23.06.2019 04:10
How do i solve this physics problem?
Answers: 3
You know the right answer?
Leslie carries a 2.00-N pebble through the path shown in the figure, starting at point A and ending...
Questions
question
Health, 20.09.2020 18:01
question
Mathematics, 20.09.2020 18:01
Questions on the website: 13722366