subject
Physics, 07.01.2021 07:40 dominiqueallen23

A 3.8kw elective motor powers an inclined conveyer belt. It is designed to lift heavy boxes from the warehouse floor to loading bay. Answer the following: a)State the energy conversion performed by the motor
b) Calculate the work done by the motor in 14 s
c) If the conveyer belt takes 14 to lift its load vertically by 5.3m, calculate the maximum mass that can carried by the conveyer belt maximum mass that can be carried by the conveyer belt
d) If a small box were to fall off the conveyer belt and hit the floor, calculate the speed at which it would hit the ground if falls from a vertical height of 4.7m

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 17:30
Abaseball picther can throw a ball at about 90 miles per hour, v = 40 m/s, on solid rock ground. we now put him into space. when he throws the ball, which weighs mb = 0.15 kg moves away from himat the same speed. how long does it take the ball thrown in space to travel the 30 meters to the batter? he weighs mp = 100kg
Answers: 1
question
Physics, 22.06.2019 05:30
Thomas his older brothers, who own a junk yard, on the weekends to earn extra money. he likes to them push broken-down cars to the back of the junk yard because it makes him feel strong. last saturday, they pushed three cars with different weights, and he noticed he used different amounts of force for each one. the cars were the following weights: white car: 2,700 kg red car: 1,500 kg blue car: 2,100 kg think about how much force is needed to move each car. which correctly lists the cars in order from the most to least amount of force needed to move them? a) white, blue, red b) blue, red, white c) red, white, blue d) white, red, blue
Answers: 2
question
Physics, 22.06.2019 08:20
The bubba chump shrimp company processes and packages shrimp for sale to wholesale seafood distributors. the shrimp are transported to the main plant by trucks that carry 1,000 pounds (lb) of shrimp. once the continuous flow processing of the shrimp begins, no inventory is allowed in buffers due to spoilage and all of the shrimp must be processed within 12 hours to prevent spoilage. the processing begins at the sorter, where the trucks dump the shrimp onto a conveyor belt that feeds into the sorter, which can sort up to 500 lb per hour. the shrimp then proceed to the desheller, which can process shrimp at the rate of 400 lb per hour. however, after 3 hours and 45 minutes of processing, the desheller must be stopped for 15 minutes to clean out empty shrimp shells that have accumulated. the veins of the shrimp are then removed in the deveining area at a maximum rate of 360 lb per hour. the shrimp proceed to the washing area, where they are processed at 750 lb per hour. finally, the shrimp are packaged and frozen. what is the daily process capacity of the processing plant (excluding the packaging and freezing)?
Answers: 2
question
Physics, 22.06.2019 15:40
If an electric circuit is not grounded it is best to reach out and touch it to provide the ground a.true or b.false
Answers: 2
You know the right answer?
A 3.8kw elective motor powers an inclined conveyer belt. It is designed to lift heavy boxes from the...
Questions
question
Mathematics, 20.09.2019 03:40
Questions on the website: 13722367