subject
Physics, 11.03.2021 18:20 3giez4

(c) A force F = 2i +3j + 4k pushes an object of mass 5 kg from the origin to a position vector r = 3i - 2j +5k. Using the scalar product of vectors, determine
the work done by the force on the object.

ansver
Answers: 3

Another question on Physics

question
Physics, 21.06.2019 16:20
A1,200 kg car is accelerated at 3.7 m/s2. what force was needed to produce this acceleration? a. 4,440 n b. 324.3 n c. 4,388 n d. 304.3 n
Answers: 2
question
Physics, 22.06.2019 04:00
Assume similar data for the motion of the blood in your aorta. estimate how many beats of the heart it will take the blood to get from your heart to your brain. (assume that the distance from your heart to your brain is 30 cm)
Answers: 2
question
Physics, 22.06.2019 07:20
Aman throws a football straight into the air. as it rises, it slows down. which type of energy is the football gaining?
Answers: 2
question
Physics, 22.06.2019 13:40
Use the profile illustrated for problem (1). assume that the layer of silty sand fill (sm) is placed over the entire site. estimate the thickness of the fill (h - in feet) that will cause the effective vertical stress at the center of the clay layer to increase by 517.5 pounds per square foot.
Answers: 1
You know the right answer?
(c) A force F = 2i +3j + 4k pushes an object of mass 5 kg from the origin to a position vector r =...
Questions
question
Social Studies, 12.12.2020 16:50
question
Mathematics, 12.12.2020 16:50
question
Mathematics, 12.12.2020 16:50
question
Mathematics, 12.12.2020 16:50
question
Mathematics, 12.12.2020 16:50
Questions on the website: 13722362