subject
Physics, 18.03.2021 03:50 lanman65

1. You are sitting on your roof, waiting for Santa Claus. You start to slide. The angle of the roof is 16 degrees and your mass is 65 kg. Draw a free body diagram and determine the
weight, normal, and incline forces.

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 17:20
When an object moves in uniform circular motion, the direction of its acceleration is a) in the same direction as its velocity vector. b) in the opposite direction of its velocity vector c) is directed toward the center of its circular path. d) is directed away from the center of its circular path. e) depends on the speed of the object.
Answers: 1
question
Physics, 22.06.2019 04:50
The position of a crate sliding down a ramp is given by x=(0.05t^3) m, y=(1.7t^2) m, z=(6−0.85t^5/2) m, where t is in seconds. (a) determine the magnitude of the crate's velocity when t = 2 s. (b) determine the magnitude of the crate's acceleration when t = 2 s.
Answers: 2
question
Physics, 22.06.2019 07:40
Which lists the fundamental forces in order, from strongest to weakest? strong nuclear, weak nuclear, electromagnetic, gravitational strong nuclear, electromagnetic, weak nuclear, gravitational gravitational, weak nuclear, electromagnetic, strong nuclear electromagnetic, gravitational, strong nuclear, weak nuclear
Answers: 2
question
Physics, 22.06.2019 08:20
The bubba chump shrimp company processes and packages shrimp for sale to wholesale seafood distributors. the shrimp are transported to the main plant by trucks that carry 1,000 pounds (lb) of shrimp. once the continuous flow processing of the shrimp begins, no inventory is allowed in buffers due to spoilage and all of the shrimp must be processed within 12 hours to prevent spoilage. the processing begins at the sorter, where the trucks dump the shrimp onto a conveyor belt that feeds into the sorter, which can sort up to 500 lb per hour. the shrimp then proceed to the desheller, which can process shrimp at the rate of 400 lb per hour. however, after 3 hours and 45 minutes of processing, the desheller must be stopped for 15 minutes to clean out empty shrimp shells that have accumulated. the veins of the shrimp are then removed in the deveining area at a maximum rate of 360 lb per hour. the shrimp proceed to the washing area, where they are processed at 750 lb per hour. finally, the shrimp are packaged and frozen. what is the daily process capacity of the processing plant (excluding the packaging and freezing)?
Answers: 2
You know the right answer?
1. You are sitting on your roof, waiting for Santa Claus. You start to slide. The angle of the roof...
Questions
question
English, 23.04.2020 01:21
question
Social Studies, 23.04.2020 01:22
question
English, 23.04.2020 01:22
question
Mathematics, 23.04.2020 01:22
Questions on the website: 13722367