Physics, 26.03.2021 03:20 999986536

If the delay of the 10-bit adder is 1ns, the setup time, the hold time, and the propagation delay of the registers is 0.3 ns, 0.1 ns, and 0.2 ns, respectively. The minimum cycle time is ns.

ansver
Answers: 1

Another question on Physics

question
Physics, 23.06.2019 02:00
How do you count the total number of atoms present on one side of a chemical equation?
Answers: 1
question
Physics, 23.06.2019 03:10
You want to move a heavy box with mass 30.0 kg across a carpeted floor. you pull hard on one of the edges of the box at an angle 30∘ above the horizontal with a force of magnitude 240 n, causing the box to move horizontally. the force of friction between the moving box and the floor has magnitude 41.5 n . what is the box's acceleration just after it begins to move
Answers: 1
question
Physics, 23.06.2019 03:20
The motion of water in a dam serves human beings by generating electricity as it is a controlled motion. give one example for an uncontrolled motion. what effects could it cause
Answers: 1
question
Physics, 23.06.2019 04:31
In which item is energy stored in the form of gravitational potential energy? a. a slice of bread b. a compressed spring c. an apple on a tree d. a stretched bow string
Answers: 1
You know the right answer?
If the delay of the 10-bit adder is 1ns, the setup time, the hold time, and the propagation delay of...