subject
Physics, 12.04.2021 17:40 Jamilia561

Read the passage then answer the question that follows. Mass Number

The mass number of an atom is the sum of the number of protons and the number of neutrons in the nucleus of an atom.

Mass number = number of protons + number of neutrons For example, you can calculate the mass number of the copper atom listed in Table 4: 29 protons plus 34 neutrons equals a mass number of 63.

Also, if you know the mass number and the atomic number of an atom, you can calculate the number of neutrons in the nucleus. The number of neutrons is equal to the mass number minus the atomic number. In fact, if you know two of the three numbers—mass number, atomic number, number of neutrons—you can always calculate the third.

The mass number of an atom is 35 and it has 16 protons. How many neutrons does this atom contain?

The atom contains
neutrons

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 05:30
Física: un futbolista patea hacia el arco con una velocidad de 15m/ah, calcular: a)el alcance para un ángulo de tiro de 25? , b) el tiempo que el balón permanece en el aire.
Answers: 3
question
Physics, 22.06.2019 08:00
Which graph represents motion with an object with positive velocity that is located at a position of 3 meters at a time of 0 seconds? a) a b) bb eliminate c) c d) d
Answers: 1
question
Physics, 22.06.2019 08:20
The bubba chump shrimp company processes and packages shrimp for sale to wholesale seafood distributors. the shrimp are transported to the main plant by trucks that carry 1,000 pounds (lb) of shrimp. once the continuous flow processing of the shrimp begins, no inventory is allowed in buffers due to spoilage and all of the shrimp must be processed within 12 hours to prevent spoilage. the processing begins at the sorter, where the trucks dump the shrimp onto a conveyor belt that feeds into the sorter, which can sort up to 500 lb per hour. the shrimp then proceed to the desheller, which can process shrimp at the rate of 400 lb per hour. however, after 3 hours and 45 minutes of processing, the desheller must be stopped for 15 minutes to clean out empty shrimp shells that have accumulated. the veins of the shrimp are then removed in the deveining area at a maximum rate of 360 lb per hour. the shrimp proceed to the washing area, where they are processed at 750 lb per hour. finally, the shrimp are packaged and frozen. what is the daily process capacity of the processing plant (excluding the packaging and freezing)?
Answers: 2
question
Physics, 22.06.2019 18:00
Efficiency is the ratio of to for a system a)power in to power in b)power in to power out c) power out to power out d) power out to power in
Answers: 2
You know the right answer?
Read the passage then answer the question that follows. Mass Number

The mass number of...
Questions
question
History, 20.01.2020 00:31
question
Mathematics, 20.01.2020 00:31
question
Social Studies, 20.01.2020 00:31
question
World Languages, 20.01.2020 00:31
Questions on the website: 13722359