subject
Physics, 18.04.2021 17:10 BardiFan

The power station operates with a capacity of (400 MW) and a difference of voltage (75kV), and provides power to homes through cables of total resistance 5Ω. Calculate the percentage of energy lost in the cables for the power produced?

""Don't send link i just want the answer here""

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 22:30
The of a machine determines its "usefulness." a. input force b. output force c. mechanical advantage
Answers: 2
question
Physics, 22.06.2019 09:30
True or false graphs must include scales that increase by the same amount
Answers: 3
question
Physics, 22.06.2019 17:00
Two conductors, a and b, are each in the shape of a tetrahedron. but of different sizes. they are charged in the following manner: 1. tetrahedron a is charged from an electrostatic generator to charge q. 2. tetrahedron a is briefly touched to tetrahedron b. 3. steps 1 and 2 are repeated until the charge on tetrahedron b reaches a maximum value. if the charge on tetrahedron b was q/4 after the first time it touched tetrahedron a. what is the final charge qbmax on tetrahedron b?
Answers: 2
question
Physics, 22.06.2019 20:30
Aball is thrown from the top of a building with an initial velocity of 21.9 m/s straight upward, at an initial height of 51.6 m above the ground. the ball just misses the edge of the roof on its way down, as shown in the figure. (a) determine the time needed for the ball to reach its maximum height. (b) determine the maximum height. (c) determine the time needed for the ball to return to the height from which it was thrown, and the velocity of the ball at that instant. (d) determine the time needed for the ball to reach the ground. (e) determine the velocity and position of the ball at t = 5.35 s.
Answers: 1
You know the right answer?
The power station operates with a capacity of (400 MW) and a difference of voltage (75kV), and provi...
Questions
question
Mathematics, 22.07.2019 04:30
Questions on the website: 13722361