subject
Physics, 15.10.2019 13:30 jackb9361

How many students would it take to move 10 teachers, together exerting a force of 50 000n, once around a 400m track. each students contributes 2000kj of work.

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 17:30
What is the relationship between the wavelength of a wave and it's energy?
Answers: 1
question
Physics, 22.06.2019 04:50
The position of a crate sliding down a ramp is given by x=(0.05t^3) m, y=(1.7t^2) m, z=(6−0.85t^5/2) m, where t is in seconds. (a) determine the magnitude of the crate's velocity when t = 2 s. (b) determine the magnitude of the crate's acceleration when t = 2 s.
Answers: 2
question
Physics, 22.06.2019 08:30
Determine the age of a fossil if it had only one eighth of its original carbon-14 content remaining?
Answers: 3
question
Physics, 22.06.2019 10:30
Avery long solenoid of inner radius 2.75 cm creates an oscillating magnetic field of the form = for this solenoid, =0.00425 t and =319 rad/s. (a)what is the maximum value of the induced electric field at a perpendicular distance 1.45 cm from the axis of the solenoid? (b) what is the maximum value of the inducted electric field at a point 5.85 cm perpendicular from the axis of the solenoid?
Answers: 1
You know the right answer?
How many students would it take to move 10 teachers, together exerting a force of 50 000n, once arou...
Questions
question
Mathematics, 18.05.2020 21:58
Questions on the website: 13722367