Answers: 3
Physics, 22.06.2019 10:00
Two objects of different mass start from rest, are pulled by the same magnitude net force, and are moved through the same distance. the work done on object 1 is 900 j. after the force has pulled each object, object 1 moves twice as fast as object 2. how much work is done on object 2?
Answers: 1
Physics, 22.06.2019 16:40
The force needed to overcome static friction is usually less than that needed to overcome kinetic friction.true or false?
Answers: 1
Physics, 22.06.2019 21:00
Acentrifuge in a medical laboratory rotates at an angular speed of 3,700 rev/min. when switched off, it rotates through 54.0 revolutions before coming to rest. find the constant angular acceleration (in rad/s2) of the centrifuge. your response is within 10% of the correct value. this may be due to roundoff error, or you could have a mistake in your calculation. carry out all intermediate results to at least four-digit accuracy to minimize roundoff error. rad/s2
Answers: 1
Physics, 22.06.2019 23:00
Hunter’s velocity was 4.5 m/s. at the end of his race, his velocity was the same. which best describes his movement? his movement stopped. his acceleration is zero. his time was constant. his acceleration was positive.
Answers: 1
Jin walked 4 km on a straight path to get to the sandwich shop. he traveled 30° south of east. what...
Mathematics, 20.09.2020 06:01
Mathematics, 20.09.2020 06:01
Mathematics, 20.09.2020 06:01
Mathematics, 20.09.2020 06:01
English, 20.09.2020 06:01
Mathematics, 20.09.2020 06:01
Arts, 20.09.2020 06:01
History, 20.09.2020 06:01
History, 20.09.2020 06:01
Mathematics, 20.09.2020 06:01