subject
Physics, 28.04.2021 03:10 stephanieyingepbtcf8

Starting from the results of Examples 5.4 and 5.5, estimate the number of cubic meters of water that would flow each second through an OTEC plant large enough ( 1000 M W e 1000 MWe) to provide electricity for Miami. Use the approximation of an ideal heat engine as in the examples. If this water flows at a velocity of 4 m / s 4 m/s, what would be the necessary diameter of the pipes?

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 05:30
James is trying to prove newton's 2nd law of motion. he tries to move four different objects with different masses, shapes, and sizes from point a to point b. the objects are a toy car, a car, a refrigerator, and a kitchen table. after some experimentation, he finds that force is dependent on the mass of the object, rather than it's size or shape. the object that takes the most force to move is the
Answers: 1
question
Physics, 22.06.2019 10:00
Two objects of different mass start from rest, are pulled by the same magnitude net force, and are moved through the same distance. the work done on object 1 is 900 j. after the force has pulled each object, object 1 moves twice as fast as object 2. how much work is done on object 2?
Answers: 1
question
Physics, 22.06.2019 15:10
Where do magnetic lines of force enter earth?
Answers: 3
question
Physics, 22.06.2019 16:30
The ph is the a.independent variable b.the dependent variable c.control group
Answers: 1
You know the right answer?
Starting from the results of Examples 5.4 and 5.5, estimate the number of cubic meters of water that...
Questions
question
Mathematics, 28.01.2021 18:40
question
Mathematics, 28.01.2021 18:40
question
Mathematics, 28.01.2021 18:40
question
Mathematics, 28.01.2021 18:40
question
Mathematics, 28.01.2021 18:40
question
Mathematics, 28.01.2021 18:40
question
Mathematics, 28.01.2021 18:40
Questions on the website: 13722367