subject
Physics, 05.05.2021 19:50 adeanbates

The field lines around one end of a bar magnet are shown below. A vertical box labeled with a question mark. Curved lines with arrowheads point into the top of the box from the top and sides.

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 05:30
The volume of a gas is halved during an adiabatic compression that increases the pressure by a factor of 2.5. what is the specific heat ratio? show the math steps .
Answers: 3
question
Physics, 22.06.2019 12:10
Consider a one meter long horizontal pipe with a constant 100 cm^2 cross sectional area. water flows rightward into the pipe at x = 0 with flow velocity 02m/sec at every point within the pipe intake area. at x=1, the rightward flow rate is 0.192 m/sec. assume the water is a conserved quantity in the pipe, so there must be a leak (a sink) somewhere in the pipe. 1. compute net volumetric flow of the source if the system to be in equilibrium. 2. now assume the pipe in the problem has no leaks. compute the net volumetric rate of change for the system.
Answers: 3
question
Physics, 22.06.2019 14:40
Asolid cylinder and a cylindrical shell have the same mass, same radius, and turn on frictionless, horizontal axles. the cylindrical shell has light-weight spokes connecting the shell to the axle. a rope is wrapped around each cylinder and tied to blocks of equal masses that are held the same height above the ground. both blocks are released simultaneously. the ropes do not slip. which block hits the ground first? or is it a tie?
Answers: 3
question
Physics, 22.06.2019 17:00
The chart shows the costs and shipping times for materials that a company needs to build a new product. which describes the best trade-off if the company needs to start building their product within the next two years? they should order the domestic materials because it is always best to choose the fastest shipping time. they should order the imported materials because it is always best to choose the lowest cost for materials. since the shipping time is longer, they should order the domestic materials because the additional cost is worth it to get the materials in time. even though the shipping time is longer, they should order the imported materials because they are less expensive and should arrive in plenty of time to build the product.
Answers: 1
You know the right answer?
The field lines around one end of a bar magnet are shown below. A vertical box labeled with a questi...
Questions
question
English, 17.09.2019 13:30
Questions on the website: 13722367