subject
Physics, 11.05.2021 14:00 TexaSuperdude

14. The diagram below shows a "couple" in action 20N
20N
Given that the diameter of the wheel is 0.om, determine the moment to the couple​

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 00:00
Astate of matter all that has define volume and can flow is a(n)
Answers: 3
question
Physics, 22.06.2019 00:20
Consider the particle-in-a-box problem in 1d. a particle with mass m is confined to move freely between two hard walls situated at x = 0 and x = l. the potential energy function is given as (a) describe the boundary conditions that must be satisfied by the wavefunctions ψ(x) (such as energy eigenfunctions). (b) solve the schr¨odinger’s equation and by using the boundary conditions of part (a) find all energy eigenfunctions, ψn(x), and the corresponding energies, en. (c) what are the allowed values of the quantum number n above? how did you decide on that? (d) what is the de broglie wavelength for the ground state? (e) sketch a plot of the lowest 3 levels’ wavefunctions (ψn(x) vs x). don’t forget to mark the positions of the walls on the graphs. (f) in a transition between the energy levels above, which transition produces the longest wavelength λ for the emitted photon? what is the corresponding wavele
Answers: 1
question
Physics, 22.06.2019 08:00
Choose each of the settings that follow and list them below do it ill mark brainliest first object= position= speed= acceleration= second object= position= speed= acceleration=
Answers: 2
question
Physics, 22.06.2019 08:20
The bubba chump shrimp company processes and packages shrimp for sale to wholesale seafood distributors. the shrimp are transported to the main plant by trucks that carry 1,000 pounds (lb) of shrimp. once the continuous flow processing of the shrimp begins, no inventory is allowed in buffers due to spoilage and all of the shrimp must be processed within 12 hours to prevent spoilage. the processing begins at the sorter, where the trucks dump the shrimp onto a conveyor belt that feeds into the sorter, which can sort up to 500 lb per hour. the shrimp then proceed to the desheller, which can process shrimp at the rate of 400 lb per hour. however, after 3 hours and 45 minutes of processing, the desheller must be stopped for 15 minutes to clean out empty shrimp shells that have accumulated. the veins of the shrimp are then removed in the deveining area at a maximum rate of 360 lb per hour. the shrimp proceed to the washing area, where they are processed at 750 lb per hour. finally, the shrimp are packaged and frozen. what is the daily process capacity of the processing plant (excluding the packaging and freezing)?
Answers: 2
You know the right answer?
14. The diagram below shows a "couple" in action 20N
20N
Given that the diameter of the w...
Questions
question
Mathematics, 21.01.2021 08:00
question
Medicine, 21.01.2021 08:00
question
Biology, 21.01.2021 08:00
question
Mathematics, 21.01.2021 08:00
Questions on the website: 13722363