Answers: 2
Physics, 22.06.2019 10:00
Two objects of different mass start from rest, are pulled by the same magnitude net force, and are moved through the same distance. the work done on object 1 is 900 j. after the force has pulled each object, object 1 moves twice as fast as object 2. how much work is done on object 2?
Answers: 1
Physics, 22.06.2019 11:20
If a rock is thrown upward on the planet mars with a velocity of 12 m/s, its height (in meters) after t seconds is given by h = 12t − 1.86t2. (a) find the velocity of the rock after two seconds. m/s (b) find the velocity of the rock when t = a. 12−3.72a m/s (c) when will the rock hit the surface? (round your answer to one decimal place.) t = s (d) with what velocity will the rock hit the surface? m/s
Answers: 1
Physics, 22.06.2019 12:00
Suppose a wire with a current is pushed upward by a magnetic field. how would the wire move if the direction of the current reversed? explain your answer.
Answers: 1
The blades of a ceiling fan starting from rest reach an angular velocity of 22 rad/s
in 50 s. Each...
Physics, 28.08.2020 14:01
Mathematics, 28.08.2020 14:01
Mathematics, 28.08.2020 14:01
Mathematics, 28.08.2020 14:01
Mathematics, 28.08.2020 14:01
Social Studies, 28.08.2020 14:01
Biology, 28.08.2020 14:01