subject
Physics, 28.06.2021 17:00 moniquejackson2

Problem A block is dropped onto a spring that is attached to the ground. The block follows the pathway shown in the diagram below and passes through positions 1-3. The block is dropped at position 1, has fallen to the spring without compressing the spring at position 2, and has been momentarily stopped by the compressed spring at position 3. The height of zero (y=0y=0y, equals, 0) is marked on the diagram below.
Click each dot on the image to select all answers that apply. Choices:
KKK
U_gU
g

U, start subscript, g, end subscript
U_sU
s

U, start subscript, s, end subscript
The diagram shows a block's pathway as it falls onto a spring. Position 1 is at the moment the block is dropped above the spring. Position 2 is just before the block hits the spring. Position 3 is at the block's lowest point where the spring momentarily stops the block.

Select the types of energy present (non-zero) for the block-Earth-spring system as the block is at each of

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 04:00
It can take some of those large , industrial vehicles up to feet to stop when traveling only 60 mph, and therefore , you shoukd be mindful to not be jn the traffic right in front of them a. 100 feet b. 200 feet c. 335 feet d. 425 feet
Answers: 1
question
Physics, 22.06.2019 13:00
Aplayground merry-go-round has a radius of 4.6 m and a moment of inertia of 200 kg-m2 and turns with negligible friction about a vertical axle through its center. a child applies a 26.0 n force tangentially to the edge of the merry-go-round for 15.0 seconds. if the merry-go-round is initially at rest, how much work did the child do on the merry-go-round?
Answers: 1
question
Physics, 22.06.2019 14:40
Sort the images based on whether there's a force of attraction or repulsion between the magnets shown. attraction repulsion
Answers: 2
question
Physics, 22.06.2019 17:00
The chart shows the costs and shipping times for materials that a company needs to build a new product. which describes the best trade-off if the company needs to start building their product within the next two years? they should order the domestic materials because it is always best to choose the fastest shipping time. they should order the imported materials because it is always best to choose the lowest cost for materials. since the shipping time is longer, they should order the domestic materials because the additional cost is worth it to get the materials in time. even though the shipping time is longer, they should order the imported materials because they are less expensive and should arrive in plenty of time to build the product.
Answers: 1
You know the right answer?
Problem A block is dropped onto a spring that is attached to the ground. The block follows the path...
Questions
question
Biology, 23.06.2019 03:00
question
Mathematics, 23.06.2019 03:00
Questions on the website: 13722367