subject
Physics, 19.10.2021 01:00 divadebbgirl1

The amount of power required to move an object can be increased without changing the amount of work required. How can this happen? Answer
A ecrease the time required to do the work.
B Increase the time required to do the work.
C Increase the friction on the surface over which the object is moving.
D Increase the weight of the object being moved.
wa

ansver
Answers: 3

Another question on Physics

question
Physics, 22.06.2019 00:30
Part f - example: finding two forces (part i) two dimensional dynamics often involves solving for two unknown quantities in two separate equations describing the total force. the block in (figure 1) has a mass m=10kg and is being pulled by a force f on a table with coefficient of static friction îľs=0.3. four forces act on it: the applied force f (directed î¸=30â above the horizontal). the force of gravity fg=mg (directly down, where g=9.8m/s2). the normal force n (directly up). the force of static friction fs (directly left, opposing any potential motion). if we want to find the size of the force necessary to just barely overcome static friction (in which case fs=îľsn), we use the condition that the sum of the forces in both directions must be 0. using some basic trigonometry, we can write this condition out for the forces in both the horizontal and vertical directions, respectively, as: fcosî¸â’îľsn=0 fsinî¸+nâ’mg=0 in order to find the magnitude of force f, we have to solve a system of two equations with both f and the normal force n unknown. use the methods we have learned to find an expression for f in terms of m, g, î¸, and îľs (no n).
Answers: 2
question
Physics, 22.06.2019 02:30
Agas initially at p1 = 1 bar and occupying a volume of 0.5 liter is compressed within a piston–cylinder assembly to a final pressure p2 = 4 bar. (a) if the relationship between pressure and volume during the compression is pv = constant, determine the volume, in liters, at a pressure of 3 bar. (b) repeat for a linear pressure–volume relationship between the same end states. reference
Answers: 1
question
Physics, 22.06.2019 08:20
The bubba chump shrimp company processes and packages shrimp for sale to wholesale seafood distributors. the shrimp are transported to the main plant by trucks that carry 1,000 pounds (lb) of shrimp. once the continuous flow processing of the shrimp begins, no inventory is allowed in buffers due to spoilage and all of the shrimp must be processed within 12 hours to prevent spoilage. the processing begins at the sorter, where the trucks dump the shrimp onto a conveyor belt that feeds into the sorter, which can sort up to 500 lb per hour. the shrimp then proceed to the desheller, which can process shrimp at the rate of 400 lb per hour. however, after 3 hours and 45 minutes of processing, the desheller must be stopped for 15 minutes to clean out empty shrimp shells that have accumulated. the veins of the shrimp are then removed in the deveining area at a maximum rate of 360 lb per hour. the shrimp proceed to the washing area, where they are processed at 750 lb per hour. finally, the shrimp are packaged and frozen. what is the daily process capacity of the processing plant (excluding the packaging and freezing)?
Answers: 2
question
Physics, 23.06.2019 02:00
How did the germans define who was jewish?
Answers: 1
You know the right answer?
The amount of power required to move an object can be increased without changing the amount of work...
Questions
question
Geography, 30.05.2020 03:58
Questions on the website: 13722367