subject
Physics, 09.12.2021 19:30 brayann5761

Read the excerpt from The Building of Manhattan. A temporary, small narrow-gauge track system was installed on each floor as it was needed. This enabled the material to be moved from the truck at ground level onto dump carts, raised by elevator to the designated floor, wheeled onto the track, and moved quickly to the exact spot needed. Turntables built into the track allowed the carts to be shifted about in any direction.

Which question can be answered only if an illustration accompanies the text?

What did turntables built into the track allow?
How were dump carts raised to designated floors?
When was a track system installed on a floor?
What does a turntable built into a track loo

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 19:00
Modify the equation fδt=δ (mv) to find the force of friction.
Answers: 2
question
Physics, 22.06.2019 07:30
The charge on a charged sphere is: a)concentrated at its centerb)distributed uniformly throughout its volumec)clustered on its centerd)distributed uniformly over its surface
Answers: 1
question
Physics, 22.06.2019 12:00
The mass of a bowling ball is 10 kg and the mass of a ping pong ball is 0.015 kg. if the two objects are 5 meters apart, what is the gravitational force ?
Answers: 1
question
Physics, 22.06.2019 13:30
Why do astronauts in the space shuttle weigh less?
Answers: 3
You know the right answer?
Read the excerpt from The Building of Manhattan. A temporary, small narrow-gauge track system was...
Questions
question
Mathematics, 09.04.2021 20:40
question
Mathematics, 09.04.2021 20:40
question
Mathematics, 09.04.2021 20:40
Questions on the website: 13722362