subject
Physics, 31.07.2019 17:40 mwshehat0

Amining company plans to improve the infrastructure in a location to start mining activities. the company calculated the costs and earnings listed below to find out if mining would be economically feasible in the location. a: cost of land for mining b: cost of equipment c: cost of labor d: miscellaneous costs related to mining e: cost of reclamation f: earnings from selling the resulting mineral how can the mining company best decide whether mining activities in the location would be economically feasible? select one: a. by confirming that f is greater than a + b + c + d + e b. by confirming that d is greater than a + b + c + e + f c. by confirming that b is lesser than a + c + d + e + f d. by confirming that c is lesser than a + b + d + e + f

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 05:00
Red light strikes a metal surface and electrons are ejected. if violet light is now used with a 10% greater intensity, what will happen to the ejection rate (number of ejected electrons per second) and the maximum energy of the electrons? a) greater ejection rate; same maximum energyb) same ejection rate; greater maximum energyc) greater ejection rate; greater maximum energyd) same ejection rate; same maximum energye) none of the above answers are correct
Answers: 1
question
Physics, 22.06.2019 07:00
The table below shows the acceleration of gravity on different bodies in the solar system. on which body would a 10 kg lamp has the most gravitational potential energy when lifted to a height of 2 m? a. earth b. mars c. neptune d. uranus
Answers: 1
question
Physics, 22.06.2019 08:00
Hydrogen and helium are both members of?
Answers: 2
question
Physics, 22.06.2019 10:00
Which fact supports the conclusion that there will be fewer farm managers in the future? a) a farmer manager’s duties vary by the type of farm. b) farm technology is replacing some administrative jobs c) farm managers often need experience but not education. d) administrative duties include budgeting and training staff.
Answers: 2
You know the right answer?
Amining company plans to improve the infrastructure in a location to start mining activities. the co...
Questions
question
Mathematics, 28.10.2020 16:30
Questions on the website: 13722361