Answers: 1
Physics, 22.06.2019 19:50
Aleaky 10-kg bucket is lifted from the ground to a height of 15 m at a constant speed with a rope that weighs 0.7 kg/m. initially the bucket contains 45 kg of water, but the water leaks at a constant rate and finishes draining just as the bucket reaches the 15-m level. find the work done. (use 9.8 m/s2 for g.) show how to approximate the required work by a riemann sum. (let x be the height in meters above the ground. enter xi* as xi.) lim n → ∞ n (9.8)(45−3 xi) i = 1 δx express the work as an integral. 0 dx evaluate the integral. (round your answer to the nearest integer.) j
Answers: 3
Physics, 22.06.2019 23:30
Which of the following forces require physical contact? tension air resistance friction magnetic force applied force
Answers: 3
Calculate the energy in kilowatt hours used by a heater that operates continuously for 30 minutes. t...
French, 11.01.2021 20:30
Mathematics, 11.01.2021 20:30
History, 11.01.2021 20:30
Arts, 11.01.2021 20:30
Computers and Technology, 11.01.2021 20:30
Social Studies, 11.01.2021 20:30
Mathematics, 11.01.2021 20:30
Mathematics, 11.01.2021 20:30
Mathematics, 11.01.2021 20:30
Chemistry, 11.01.2021 20:30
Mathematics, 11.01.2021 20:30
Geography, 11.01.2021 20:30