Answers: 1
Physics, 22.06.2019 13:10
1. the materials manager for a billiard ball maker must periodically place orders for resin, one of the raw materials used in producing billiard balls. she knows that manufacturing uses resin at a rate of 50 kilograms each day, and that it costs $.04 per day to carry a kilogram of resin in inventory. she also knows that the order costs for resin are $100 per order, and that the lead time for delivery is four (4) days.2. at what point should resin be reordered? a. 0 kilograms remainingb. 50 kilograms remainingc. 200 kilograms remainingd. 400 kilograms remaininge. 500 kilograms remaining3. if order size was 1,000 kilograms of resin, what would be the length of an order cycle? a. 0.05 daysb. 4 daysc. 16 daysd. 20 dayse. 50 days4. if the order size was 1,000 kilograms of resin, what would be the average inventory level? a. 50 kilogramsb. 200 kilogramsc. 500 kilogramsd. 800 kilogramse. 1,000 kilograms5. if the order size was 1,000 kilograms of resin, what would be the daily total inventory costs, excluding the cost of the resin? a. $5b. $10c. $20d. $25e. $40
Answers: 3
Physics, 22.06.2019 14:10
Match these items. 1. coulombs __force 2. ohms __emf 3. centimeters __resistance 4. newtons __charge 5. volts __length
Answers: 1
Physics, 22.06.2019 16:30
Is there a point between a 10 nc charge and a 20 nc charge at which the electric field is zero?
Answers: 2
Physics, 22.06.2019 19:00
Ahorizontal force of 400.0 n is required to pull a 1760 n truck across the floor at a constant speed. find the coefficient of sliding friction.
Answers: 1
In a experiment equal amounts of heated water and soil...
Mathematics, 22.02.2021 22:30
Social Studies, 22.02.2021 22:30
Biology, 22.02.2021 22:30
Social Studies, 22.02.2021 22:30
History, 22.02.2021 22:30
History, 22.02.2021 22:30
Mathematics, 22.02.2021 22:30
Social Studies, 22.02.2021 22:30