subject
SAT, 07.12.2021 15:20 rubend7769

A steel plant has two sources of ore, source a and source b. In order to keep the plant running, at least three tons of ore must be processed each day. Ore from source a costs $20 per ton to process, and ore from source b costs $10 per ton to process. Costs must be kept to no more than $80 per day. Moreover, federal regulations require that the amount of ore from source b cannot exceed twice the amount of ore from source a. If ore from source a yields 300 lbs of steel per ton, and ore from source b yields 400 lbs of steel per ton, how many tons of ore from each source should be processed each day to maximize the amount of steel produced?.

ansver
Answers: 3

Another question on SAT

question
SAT, 26.06.2019 06:30
Asking questions when something is unclear is part of?
Answers: 1
question
SAT, 26.06.2019 11:30
What is it called when someone gets sick from eating food contaminated with germs or toxins? a. potentially hazardous food b. ptomaine poisoning c. foodborne illness d. raw food
Answers: 1
question
SAT, 29.06.2019 15:00
While trees are not the largest level in the pyramid of numbers, they are still the base for both the pyramids of biomass and pyramids of energy. select the best answer from the choices provided t f
Answers: 1
question
SAT, 30.06.2019 17:00
The length of each side of a square is 1 centimeter more than the width of the rectangle. the length of the rectangle is 1 centimeter less than twice it’s width. the perimeters of the two figures are equal. determine the measures of the side lengths of the rectangle. show all work i have a test tomorrow
Answers: 1
You know the right answer?
A steel plant has two sources of ore, source a and source b. In order to keep the plant running, at...
Questions
question
Mathematics, 15.04.2021 02:00
question
Mathematics, 15.04.2021 02:00
question
Spanish, 15.04.2021 02:00
question
Mathematics, 15.04.2021 02:00
Questions on the website: 13722362