The pipefitting subcontractor is required to lay pipe in a trench that is 10 ft deep and 3 ft wide with vertical walls and no sloping or other protection. The trench was dug by the excavator. The general contractor supervised the work but had no employees in the trench. The concrete subcontractor told the general contractor and excavator that the trench needed to be sloped or shored before their employees could work in the trench. During the OSHA inspection, OSHA observed the general contractor at the trench supervising the pipefitter in the trench. Which contractor(s) would receive a citation for an unsafe trench?
a. pipefitting only
b. pipefitting and excavator
c. pipefitting, excavator, and general contractor
d. pipefitting, excavator, general contractor, and concrete subcontractor

ansver
Answers: 2

Another question on Social Studies

question
Social Studies, 22.06.2019 05:00
Micah is studying child behavior in playgrounds throughout the world. he wants to see how the children react when teachers select the same child to be the first to use each piece of equipment. which approach is micah is using?
Answers: 2
question
Social Studies, 22.06.2019 14:30
The colors at sunset are usually the result of raindrops
Answers: 2
question
Social Studies, 22.06.2019 17:30
Which option below best represents what is included in the calculation of the united states gross domestic product (gdp)? a. 1 b. 2 c. 3 d. 4
Answers: 1
question
Social Studies, 22.06.2019 22:00
Which us president proposed a decimal based measurement system for the us
Answers: 1
You know the right answer?
The pipefitting subcontractor is required to lay pipe in a trench that is 10 ft deep and 3 ft wide w...
Questions
question
Social Studies, 23.04.2020 04:37
question
Mathematics, 23.04.2020 04:37
question
Social Studies, 23.04.2020 04:38
Questions on the website: 13722360