subject

Acme Industries produces four types of men’s ties using three types of material. Your job is to determine how many of each type of tie to make each month. The goal is to maximize profit, where profit per tie = selling price - labor cost – material cost. Labor cost is $0.75 per tie for all four types of ties. The material requirements and costs are given below. Material Cost per yard Yards available
per month
Silk $20 1,000
Polyester $6 2,000
Cotton $9 1,250
Type of Tie
Product Information Silk Polyester Blend 1 Blend 2
Selling Price per tie $6.70 $3.55 $4.31 $4.81
Monthly Minimum units 6,000 10,000 13,000 6,000
Monthly Maximum units 7,000 14,000 16,000 8,500
Type of Tie
Material Information in yards Silk Polyester Blend 1 Blend 2
(50/50) (30/70)
Silk 0.125 0 0 0
Polyester 0 0.08 0.05 0.03
Cotton 0 0 0.05 0.07
a) Formulate the problem as a linear program with an objective function and all constraints.
b) Determine the optimal solution for the linear program using any software you want. Include a copy of the code and output.
c) What are the optimal numbers of ties of each type to maximize profit.

ansver
Answers: 3

Another question on Computers and Technology

question
Computers and Technology, 21.06.2019 23:00
Fast sportcars the top speeds of sportscars, given in miles per hour, are: 155 mph bmw m5 217 mph lamborghini aventador spyder 205 mph ferrari 488 205 mph nissan gtr 197 mph chevrolet corvette stingray zr1 258 mph bugatti veyron supersport 195 mph dodge viper 270 mph hennessey venom 155 mph bmw m3 195 mph mercedes sl given: topspeeds=[155; 217; 205; 205; 197; 258; 195; 270; 155; 195]; carnames=string(["bmw m5" "lamborghini aventador spyder" "ferrari 488" "nissan gtr" "chevrolet corvette stingray zr1" "bugatti veyron supersport" "dodge viper" "hennessey venom" "bmw m3" "mercedes sl"]); the variable is a rectangular array. write a function called selectcars to identify cars with the top speed within a given range, and display the identified names. the selected cars speed will be in a range given by lowerbound < speed < upperbound. inputs to the function selectcars are: a column array os all car top speeds named topspeeds, the corresponding chara
Answers: 2
question
Computers and Technology, 23.06.2019 20:30
If an appliance consumes 500 w of power and is left on for 5 hours, how much energy is used over this time period? a. 2.5 kwh b. 25 kwh c. 250 kwh d. 2500 kwh
Answers: 1
question
Computers and Technology, 23.06.2019 21:00
Which set of steps will organize the data to only show foods with more than 100 calories and rank their sugar content from greatest to least?
Answers: 1
question
Computers and Technology, 23.06.2019 21:30
To move a file or folder in microsoft windows, you can click and hold down the left mouse button while moving your mouse pointer to the location you want the file or folder to be, which is also known as.
Answers: 3
You know the right answer?
Acme Industries produces four types of men’s ties using three types of material. Your job is to dete...
Questions
question
Computers and Technology, 31.01.2020 09:53
question
Mathematics, 31.01.2020 09:53
Questions on the website: 13722361