Liquid water enters a cooling tower operating at a steady state 40ºc with a mass flow rate of 105 kg/h. cooled water at 25ºc exits the cooling tower at the same mass flow rate. makeup water is supplied at 23ºc. atmospheric air enters the tower at 30ºc, 1 bar, 35% relative humidity. a saturated moist air stream exits at 34 ºc, 1 bar. determine a. the mass flow rates of the dry air and makeup water, each in kg/h. b. teh rate of exergy destruction within the cooling tower, in kw, for t0 = 23ºc
![ansver](/tpl/images/cats/User.png)
Answers: 1
Another question on Engineering
![question](/tpl/images/cats/User.png)
Engineering, 04.07.2019 18:10
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
![question](/tpl/images/cats/User.png)
Engineering, 04.07.2019 18:10
Assuming compressible flow of air and that the measurements are done at flagstaff a pitot static tube that gives the difference of total and static pressure measures 0.35 m of mercury. what is the velocity of air? assume the temperature to be 300k. (submit your excel or matlab calculation sheet)
Answers: 1
![question](/tpl/images/cats/User.png)
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
![question](/tpl/images/cats/User.png)
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
Liquid water enters a cooling tower operating at a steady state 40ºc with a mass flow rate of 105 kg...
Questions
![question](/tpl/images/cats/mat.png)
![question](/tpl/images/cats/istoriya.png)
History, 28.08.2019 18:00
![question](/tpl/images/cats/istoriya.png)
![question](/tpl/images/cats/informatica.png)
Computers and Technology, 28.08.2019 18:10
![question](/tpl/images/cats/User.png)
![question](/tpl/images/cats/biologiya.png)
Biology, 28.08.2019 18:10
![question](/tpl/images/cats/istoriya.png)
![question](/tpl/images/cats/biologiya.png)
![question](/tpl/images/cats/istoriya.png)
History, 28.08.2019 18:10
![question](/tpl/images/cats/en.png)
![question](/tpl/images/cats/health.png)
![question](/tpl/images/cats/ekonomika.png)
![question](/tpl/images/cats/en.png)
English, 28.08.2019 18:10
![question](/tpl/images/cats/ekonomika.png)
![question](/tpl/images/cats/mat.png)
![question](/tpl/images/cats/en.png)
![question](/tpl/images/cats/istoriya.png)
History, 28.08.2019 18:10
![question](/tpl/images/cats/en.png)
![question](/tpl/images/cats/ekonomika.png)