subject
Engineering, 05.11.2019 06:31 crybaby222psyc

You are in charge of ordering the concrete for a basement wall concrete pour. the wall forms are all set up and ready. the wall around the basement is 10 inches thick. the interior finished dimension of the basement is 120 feet 5 inches by 86 feet 4-1/2 inches and fourteen (14') feet tall. what is the exact quantity of concrete in cubic yards (cy) to order plus three (3%) per cent added for spilled concrete.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 03.07.2019 23:20
Two technicians are discussing the intake air temperature (iat) sensor. technician a says that the computer uses the iat sensor as a backup to the engine coolant temperature (ect) sensor. technician b says that the powertrain control module (pcm) will subtract the calculated amount of fuel if the air measures hot. who is correct
Answers: 3
question
Engineering, 04.07.2019 18:10
Steel is coated with a thin layer of ceramic to protect against corrosion. what do you expect to happen to the coating when the temperature of the steel is increased significantly? explain.
Answers: 1
question
Engineering, 04.07.2019 18:10
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
You know the right answer?
You are in charge of ordering the concrete for a basement wall concrete pour. the wall forms are all...
Questions
question
Mathematics, 18.06.2020 16:57
question
Chemistry, 18.06.2020 16:57
Questions on the website: 13722367