Aprogram is seeded with 30 faults. during testing, 21 faults are detected, 15 of which are seeded faults and 6 of which are indigenous faults. what is the mill's estimate of the number of indigenous faults remaining undetected in the program?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Heat is added to a piston-cylinder device filled with 2 kg of air to raise its temperature 400 c from an initial temperature of t1 27 cand pressure of pi 1 mpa. the process is isobaric process. find a)-the final pressure p2 b)-the heat transfer to the air.
Answers: 1
question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 18:10
Compute the pressure drop of 30°c air flowing with a mean velocity of 8 m/s in a circular sheet-metal duct 300 mm in diameter and 15 m long. use a friction factor, f 0.02, and pair = 1.1644 kg/m a. 37.26 pa b. 25.27 pa n c. 29.34 pa d. 30.52 pa
Answers: 1
question
Engineering, 04.07.2019 18:20
Air is compressed isentropically from an initial state of 300 k and 101 kpa to a final temperature of 1000 k. determine the final pressure using the following approaches: (a) approximate analysis (using properties at the average temperature) (b) exact analysis
Answers: 1
You know the right answer?
Aprogram is seeded with 30 faults. during testing, 21 faults are detected, 15 of which are seeded fa...
Questions
question
Health, 03.12.2020 18:10
question
Mathematics, 03.12.2020 18:10
question
Social Studies, 03.12.2020 18:10
question
Biology, 03.12.2020 18:10
Questions on the website: 13722367