An intersection approach has a saturation flow rate of 1500 veh/h, and vehicle arrive at this approach at the rate of 800 veh/h. the approach is controlled by a pre-timed signal with a cycle length of 60 seconds and d/d/1 queuing holds. local standards require that signals should be set such that all approach queues dissipate 10 seconds before the end of the effective green portion of the cycle. assuming that approach capacity exceeds arrivals, determine the maximum length of effective red that will satisfy the local standards

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
question
Engineering, 04.07.2019 18:10
Afour cylinder four-stroke in-line engine has a stroke of 160mm, connecting rod length of 150mm, a reciprocating mass of 3kg and its firing order is 1-3-4-2. the spacing between cylinders is 100mm. i. show that the engine is in balance with regard to the primary inertia forces and primary 3. a and secondary inertia couples. li determine the out of balance secondary inertia force ii. propose ways of balancing this out of balance force and discuss the challenges that will arise
Answers: 3
question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 19:10
What is the main objective of using reheat rankine cycle?
Answers: 3
You know the right answer?
An intersection approach has a saturation flow rate of 1500 veh/h, and vehicle arrive at this approa...
Questions
question
Mathematics, 25.10.2020 06:40
question
English, 25.10.2020 06:40
question
Social Studies, 25.10.2020 06:40
Questions on the website: 13722367