subject
Engineering, 10.02.2020 23:05 sammuelanderson1539

The energy flux associated with solar radiation incident on the outer surface of the earth’s atmosphere has been accurately measured and is known to be 1368 W/m2. The diameter of the sun and earth are 1.39 X 109 and 1.27 X 107 m, respectively, and the distance between the sun and the earth is 1.5 X 1011 m.(a) What is the emissive radiation flux of the sun surface?(b) Approximating the sun’s surface as a black body ( = 1), what is its temperature?(c) At what wavelength is the spectral emissive power of the sun a maximum?(d) Assuming the earth’s surface to be a black body ( = 1) and the sun to be the only source of energy for the earth, estimate the earth’s surface temperature.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
question
Engineering, 04.07.2019 18:10
Ahot wire operates at a temperature of 200°c while the air temperature is 20°c. the hot wire element is a tungsten wire of 5 um diameter and 2 mm in length. plot using excel current, heat transfer and heat generated by the wire for air velocity varying from 1-10 m/s in steps of lm/s? matlab the sensor voltage output, resistance, or assume nu 0.989 re033pr13 take air properties at tr (200°c20°c)/2 = 110°c properties of tungsten: c 0.13 kj/kg.k 3 p 19250 kg/m k (thermal conductivity) = 174 w/m.k
Answers: 2
question
Engineering, 04.07.2019 18:10
True or false (explain) (110)[111] is a slip system in bcc metals . the {111} family in fcc contains 8 planes. resolved shear stress (rss) in single crystals is just related to the applied stress. critical resolved shear stress (crss) in single crystal metals is direct proportional to the number of defects in the structure
Answers: 2
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
The energy flux associated with solar radiation incident on the outer surface of the earth’s atmosph...
Questions
question
Mathematics, 11.03.2020 07:12
question
Mathematics, 11.03.2020 07:13
question
Social Studies, 11.03.2020 07:16
question
Mathematics, 11.03.2020 07:17
Questions on the website: 13722362