Consider a system with two tasks, Task1 and Task2. Task1 has a period of 200 ms, and Task2 has a period of 300 ms. All tasks initially tick at time 0. 1. How many times will Task1 have ticked after 1000 ms? 2. How many times will Task2 have ticked after 1000 ms? 3. After time 0, when do both Task1 and Task2 next tick at the same time? 4. What is the largest value for timerPeriod that allows both

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
question
Engineering, 04.07.2019 18:10
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
question
Engineering, 04.07.2019 18:10
Water at 70°f and streams enter the mixing chamber at the same mass flow rate, determine the temperature and the quality of the exiting stream. 0 psia is heated in a chamber by mixing it with saturated water vapor at 20 psia. if both streams enters the mixing chamber at the same mass flow rate, determine the temperature and the quality of the existing system.
Answers: 2
question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
You know the right answer?
Consider a system with two tasks, Task1 and Task2. Task1 has a period of 200 ms, and Task2 has a per...
Questions
question
Mathematics, 03.12.2020 01:20
question
Chemistry, 03.12.2020 01:20
question
Mathematics, 03.12.2020 01:20
question
German, 03.12.2020 01:20
Questions on the website: 13722367