An engineering team has a goal of developing a bicycle frame that is both lighter and stronger than previous models. Which cost-benefit analysis has

left out potential risks?

A. Better function compared to ecological damage of mining

materials and research and development time

B. Increased sales compared to research and development time and

cost of materials

O C. Increased sales compared to employee stress and loss of natural

resources

D. Better function compared to uncertain supply of materials and

research and development time

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:10
Which from the following instrument is commonly used to detect the high pitch butzing sound in bearings? [clo4] a)-digital ultrasonic meter b)-infrared camera c)-spectroscopic d)-vibrometer
Answers: 2
question
Engineering, 04.07.2019 19:10
What is creep? what is stress relaxation?
Answers: 1
You know the right answer?
An engineering team has a goal of developing a bicycle frame that is both lighter and stronger than...
Questions
question
History, 04.11.2021 21:00
question
Mathematics, 04.11.2021 21:10
Questions on the website: 13722367