subject
Engineering, 06.02.2021 01:20 ddmoorehouseov75lc

A tannery wastewater flow of 0.011 m3 /s and a BOD5 of 590 mg/L discharges into river. The creek has a flow rate of 1.7 m3 /s. Upstreatm of the tannery wastewater discharge point, the BOD5 of the creek is 0.6 mg/L. The BOD rate constants (k) are 0.115 day-1 for the tannery waste and 3.7 day-1 for the creek. (a) Calculate the initial ultimate BOD after mixing.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The drive force for diffusion is 7 fick's first law can be used to solve the non-steady state diffusion. a)-true b)-false
Answers: 1
question
Engineering, 04.07.2019 18:10
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
question
Engineering, 04.07.2019 18:10
Machinery that is a key part of the process and without which the plant or process cannot function is classifed as: (clo4) a)-critical machinery b)-essential machinery c)-general purpose machinery d)-none of the specified options.
Answers: 1
question
Engineering, 04.07.2019 19:10
What is the main objective of using reheat rankine cycle?
Answers: 3
You know the right answer?
A tannery wastewater flow of 0.011 m3 /s and a BOD5 of 590 mg/L discharges into river. The creek has...
Questions
question
English, 24.06.2019 09:00
question
Mathematics, 24.06.2019 09:00
Questions on the website: 13722367