A 8-m thick clay layer at a project site in Pullman, WA is single-drained. 3 years after placement of a surface load on top of this clay, a consolidation settlement of 50 mm was observed. At the end of primary consolidation, the ultimate settlement was 100 mm. If a sample of this soil (that is 30 mm thick), was tested in an oedometer, what would be the expected time required for 50% consolidation

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
question
Engineering, 04.07.2019 18:20
Athin walled concentric tube exchanger is used to cool engine oil from 160°c to 60°c with water that is available at 25°c acting as a coolant. the oil and water flow rates are each at 2 kg/s, and the diameter of the inner tube is 0.5 m and the corresponding value of the overall heat transfer coefficient is 250 w/m2. oc. how long must the heat exchanger be to accomplish the desired cooling? cpwater=4.187 kj/kg-candcpengine el=2.035 kj/kg·°c, oil . 120]
Answers: 1
question
Engineering, 04.07.2019 19:10
What is the main objective of using reheat rankine cycle?
Answers: 3
question
Engineering, 04.07.2019 19:10
What is creep? what is stress relaxation?
Answers: 1
You know the right answer?
A 8-m thick clay layer at a project site in Pullman, WA is single-drained. 3 years after placement o...
Questions
question
Mathematics, 22.05.2021 08:00
question
Biology, 22.05.2021 08:00
Questions on the website: 13722363