Engineering, 30.11.2021 19:10 whitakers87

1- A car (at point A) is 100 m away from point B along a circular track and begins to acceleration from rest. What
constant speed increase is needed for the total acceleration
magnitude to be 8 m/s2 when the car reaches B? the radius of
the track is 150 m. {31 m/s}

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 16:10
The force on a cutting tool are 2600n vertically downward and 2100 horizontal. determine the resultant force acting on the tool and the angle at which it acts.
Answers: 1
question
Engineering, 04.07.2019 18:10
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
question
Engineering, 04.07.2019 18:10
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
question
Engineering, 04.07.2019 18:20
The characteristic roots of a dynamic system are: 1.7920 1.8160 i, -1.7920 1.8160 i, -0.4160 what is the order of this system? what are the settling time and damping ratio of the system?
Answers: 3
You know the right answer?
1- A car (at point A) is 100 m away from point B along a circular track and begins to acceleration...
Questions
question
English, 17.11.2020 18:50
question
Geography, 17.11.2020 18:50
question
Geography, 17.11.2020 18:50
question
Mathematics, 17.11.2020 18:50
question
Mathematics, 17.11.2020 18:50
question
Computers and Technology, 17.11.2020 18:50
Questions on the website: 13722362