subject
Mathematics, 07.11.2019 22:31 dedgefield

The article uncertainty estimation in railway track life- cycle cost (j. of rail and rapid transit, 2009) presented the following data on time to repair (min) a rail break in the high rail on a curved track of a certain railway line. 159 120 480 149 270 547 340 43 228 202 240 218 the sample mean and standard deviation are 249.7 and 145.1, respectively. is there compelling evidence for concluding that true average repair time exceeds 200 min? carry out a test of hypotheses using a significance level of α = 0.05.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 20.06.2019 18:02
You paid $7.70 to the mail package that weighed 5.5 lb. right and solve any quetion to find the cost per pound ? ?
Answers: 1
question
Mathematics, 21.06.2019 19:40
The krasnapolski is a top-of-the-line hotel in amsterdam, the netherlands. among their many services, they rent bicycles to guests. the bicycle checkout is open 24 hours per day 7 days per week and has 50 bicycles on hand. on average, 10 guests request a bicycle each day, arriving completely randomly at all times of the day during the spring and summer seasons. guests keep bicycles for four days on average, with a standard deviation of two days. how long does a guest on average have to wait for a bike? a. approximately 24 hours b. approximately 0.033 hours c. approximately 4 days d. approximately 47 minutes
Answers: 3
question
Mathematics, 21.06.2019 21:00
What is the missing statement in step 4? ? rts ? ? vtu and ? rtu ? ? vts ? rts ? ? rvs and ? rtu ? ? stv ? vrs ? ? vru and ? usr ? ? usv ? vur ? ? vus and ? uvs ? ? sru
Answers: 3
question
Mathematics, 21.06.2019 23:30
Written as a simplified polynomial in standard form, what is the result when (2x+8)^2(2x+8) 2 is subtracted from 8x^2-38x 2 −3?
Answers: 3
You know the right answer?
The article uncertainty estimation in railway track life- cycle cost (j. of rail and rapid transit,...
Questions
Questions on the website: 13722360