subject
Mathematics, 05.05.2020 16:45 dyp

Consider the following problem. A task requires three phases. Let Ti denote the time to complete Phase i, for i = 1, 2, 3. The task time is T = T1 + max{T2, T3}. The phase times are independent and exponentially distributed with means 1.5, 2.3, and 6.3, respectively.
The purpose of the simulation experiment is to determine the mean and standard deviation of the task time.
1) Which part(s) of the problem correspond(s) to the "input model"?
2) Which part(s) of the problem correspond(s) to the "input data"?
3) Which part(s) of the problem correspond(s) to the "output data"?
4) What is the logical relationship between input and output?
5) Describe the performance measure(s) in this simulation
6) What is/are the experiment parameter(s) in this simulation?
7) Suggest a point estimator for the mean task time.
8) Suggest a point estimator for the standard deviation of the task time.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
Write a function that matches the description. a cosine function has a maximum of 5 and a minimum value of -5. f (r) =
Answers: 1
question
Mathematics, 21.06.2019 17:20
Acredit card advertises an annual interest rate of 23%. what is the equivalent monthly interest rate?
Answers: 1
question
Mathematics, 21.06.2019 19:20
Find the area of an equilateral triangle with a side of 6 inches
Answers: 2
question
Mathematics, 21.06.2019 19:30
Joel wants to buy a new tablet computer fram a store having a 20% off sale on all tablets. the tablet he wants has an original cost of $190. he also wants to make sure he has enough money to pay the 5% sales tax. part one joel uses the incorect expression 0.95(190)(0.8) to calculate that the tablet will cost him a total of $144.40. describe his error and write the correct expression part two how much will joel pay for the tablet show your work if you answer this question correctly you will receive a prize of 99 points good luck
Answers: 2
You know the right answer?
Consider the following problem. A task requires three phases. Let Ti denote the time to complete Pha...
Questions
question
Geography, 21.09.2019 18:30
Questions on the website: 13722360