It will take five builders 62 days to complete a particular project. At this rate, how long would the project take if there were only two builders?(SHOW WORK)

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
Which speed is the fastest (use 1 mile ≈ 1.6 kilometers)? a. 12 miles/hour b. 18 feet/second c. 19 kilometers/hour d. cannot be determined
Answers: 1
question
Mathematics, 21.06.2019 19:40
Afactory makes propeller drive shafts for ships. a quality assurance engineer at the factory needs to estimate the true mean length of the shafts. she randomly selects four drive shafts made at the factory, measures their lengths, and finds their sample mean to be 1000 mm. the lengths are known to follow a normal distribution whose standard deviation is 2 mm. calculate a 95% confidence interval for the true mean length of the shafts. input your answers for the margin of error, lower bound, and upper bound.
Answers: 3
question
Mathematics, 22.06.2019 00:00
Let u = {q, r, s, t, u, v, w, x, y, z} a = {q, s, u, w, y} b = {q, s, y, z} c = {v, w, x, y, z}. list the elements in the set.a ∩ (b ∪ c)a) {q, s, w, y}b) {q, y, z}c) {q, s, u, w, y, z}d) {q, r, w, y, z}
Answers: 1
question
Mathematics, 22.06.2019 00:00
The graph is supposed to show f(x) = 3 sin (x/4+1) - 1/2. which of the following are correctly represented in the graph? select two of the following that apply.
Answers: 1
You know the right answer?
It will take five builders 62 days to complete a particular project. At this rate, how long would th...
Questions
question
Mathematics, 25.09.2019 03:30
Questions on the website: 13722362