subject
Mathematics, 23.12.2020 17:10 simmy6

4.8.2 Slope and Rise The least possible slope shall be used for any ramp. The maximum slope of a ramp in new construction shall be 1:12. The maximum rise for any ramp run shall be 30 inches. Curb ramps and ramps to be constructed on existing sites or in existing buildings or facilities may have slopes and rises, if space limitations prohibit the use of a 1:12 slope or less.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 21:30
Ok a point t on a segment with endpoints d(1, 4) and f(7, 1) partitions the segment in a 2: 1 ratio. find t. you must show all work to receive credit.
Answers: 1
question
Mathematics, 21.06.2019 23:30
Darren earned $663.26 in net pay for working 38 hours. he paid $118.51 in federal and state income taxes, and $64.75 in fica taxes. what was darren's hourly wage? question options: $17.45 $19.16 $20.57 $22.28
Answers: 3
question
Mathematics, 22.06.2019 00:00
The equation of line wx is y=2x-5. write an equation of a line perpendicular to line wx in slopeintercept form the contains points (-1,-2)
Answers: 2
question
Mathematics, 22.06.2019 00:30
Which is an x-intercept of the graphed function? (0, 4) (–1, 0) (4, 0) (0, –1)
Answers: 2
You know the right answer?
4.8.2 Slope and Rise The least possible slope shall be used for any ramp. The maximum slope of a ram...
Questions
question
English, 18.03.2021 17:30
question
Arts, 18.03.2021 17:30
question
Mathematics, 18.03.2021 17:30
question
Mathematics, 18.03.2021 17:30
Questions on the website: 13722360