subject
Mathematics, 08.03.2021 04:40 soso585oo

Type the correct answer in each box. Use numerals instead of words. A new test is developed to test for organic matter in soil samples, giving "positive" or "negative" results to indicate that a sample does or does
not contain organic matter.
For a soil sample that contains organic matter, the test will give a positive result 95% of the time and a negative result (false negative) 5% of the
time. For a soil sample that does not contain organic matter, the test will give a positive result (false positive) 20% of the time and a negative
result 80% of the time.
A study included a population of 1,000 soil samples, and 70% of those studied where known to contain organic matter.
Fill in the missing values in the table and statement below. If necessary, round the percentage to one decimal place.
Number of Positive Negative
Samples
Result
Result
Contains
700
665
Organic Matter
Does Not
Contain
300
240
Organic Matter
If a soil sample test gives a positive result, it is
% likely that the soil sample contains organic matter.


Type the correct answer in each box. Use numerals instead of words.

A new test is developed to te

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:50
On a string instrument, the length of a string varies inversely as the frequency of its vibrations. an 11-inch string has a frequency of 400 cylces per second. find the frequency of a 10-icnch string.
Answers: 2
question
Mathematics, 21.06.2019 18:30
What is coefficient of the term of degree of degree 5 in the polynomial below
Answers: 1
question
Mathematics, 21.06.2019 21:30
Two airplanes start at the same place and travel in opposite directions,one at 395 miles per hour and the other at 422 miles per hour. how many hours will it take for the planes to be 2451 miles apart?
Answers: 1
question
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
You know the right answer?
Type the correct answer in each box. Use numerals instead of words. A new test is developed to test...
Questions
question
Chemistry, 15.10.2019 20:30
Questions on the website: 13722367