Mathematics, 28.05.2021 20:20 Paris4life
A half-million-square-foot warehouse facility is being considered by your company for a location in Kansas City, KS. You have a bid for a similar typo 25,000 ft^2 facility in Washington, DC, at exist4,375,000. If the warehouse construction cost index value for KS is 0.75 and for DC it is 1.34, what range should the KS bid fail into if you assume that construction costs are linear across size?
a. Less than exist 30 million
b. Between exist 30 million and exist 60 million
c. Between exist 60 million and exist 100 million
d. Greater than exist 100 million
Answers: 2
Mathematics, 21.06.2019 19:30
In the geometric progression –3, 12, −48… what term is 3,072?
Answers: 2
A half-million-square-foot warehouse facility is being considered by your company for a location in...
Chemistry, 24.08.2021 17:50
Computers and Technology, 24.08.2021 17:50
History, 24.08.2021 17:50
Mathematics, 24.08.2021 17:50
Chemistry, 24.08.2021 17:50
English, 24.08.2021 17:50
Advanced Placement (AP), 24.08.2021 17:50
Chemistry, 24.08.2021 17:50
Mathematics, 24.08.2021 17:50
Mathematics, 24.08.2021 17:50