subject
Mathematics, 14.07.2021 21:00 gracekerleyy

A building contractor is to dig a foundation 45 feet long, 16 feet wide, and 6 feet deep. The contractor pays $11 per load for trucks to remove the dirt. Each truckload holds 4 cubic yards. What is the cost to the contractor to have all the dirt hauled away?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:00
Ricardo ran the 400 meter race 3 times his fastest time was 54.3 seconds his slowest time was 56.1 seconds if his average time was 55.0 seconds what was his time for the third race
Answers: 2
question
Mathematics, 21.06.2019 18:00
Write an equation in slope intercept form of the line passes through the given point and is parallel to the graph of the given equation (0,0); y=3/8 x+2
Answers: 1
question
Mathematics, 21.06.2019 19:00
Abacteria population is tripling every hour. by what factor does the population change in 1/2 hour? select all that apply
Answers: 1
question
Mathematics, 21.06.2019 20:00
Beth divided 9 ounces of her granola recipe into 4 equal-sized amounts. she placed the amounts into individual bowls. the fraction 9/4 represents the number of ounces of granola in each bowl. which other number represents the amount of granola beth has in each bowl? (a) 1 1/4 (b) 2 1/4 (c) 1 3/4 (d) 3 3/4 i need !
Answers: 2
You know the right answer?
A building contractor is to dig a foundation 45 feet long, 16 feet wide, and 6 feet deep. The contra...
Questions
question
Mathematics, 07.06.2021 14:00
question
History, 07.06.2021 14:00
question
Mathematics, 07.06.2021 14:00
question
English, 07.06.2021 14:00
Questions on the website: 13722367