Determine the quantity of work done when a crane lifts a 100-n and block from 2 m above the ground to a 6 m above the ground


Determine the quantity of work done when a crane lifts a 100-n and block from 2 m above the ground t

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 00:30
Next a skier is pulled by a tow rope up a frictionless ski slope that makes an angle of 15 with the horizontal. the rope moves parallel to the slope with a constant speed of 0.69 m/s. the force of the rope does 800 3 of work on the skier as the skier moves a distance of 8.4 m up the incline. (a) if the rope moved with a constant speed of 2.2 m/s how much work would the force of the rope do on the skier as the skler moved a distance of 8.4 m up the incline? at what rate is the force of the rope doing work on the skier when the rope moves with a speed of (b) 0.69 m/s and (c) 2.2 m/s?
Answers: 1
question
Physics, 22.06.2019 05:30
What is the most useful equation for electric power?
Answers: 3
question
Physics, 22.06.2019 08:20
At an oceanside nuclear power plant, seawater is used as part of the cooling system. this raises the temperature of the water that is discharged back into the ocean. the amount that the water temperature is raised has a uniform distribution over the interval from 10° to 25° c. what is the standard deviation of the temperature increase?
Answers: 1
question
Physics, 22.06.2019 09:00
For which pair of objects would adding the same a
Answers: 1
You know the right answer?
Determine the quantity of work done when a crane lifts a 100-n and block from 2 m above the ground t...
Questions
question
Mathematics, 17.07.2019 19:20
Questions on the website: 13722360